Need Help?
Speak with a human to filling out a form? call corporate office and we will connect you with a team member who can help.
+1 (774) 707-6030
Design & Project Planning
Turning ideas into detailed, build-ready plans with precision, creativity, and clarity.
Our Design & Project Planning service transforms your vision into a complete architectural and construction roadmap. We combine innovative design thinking with technical expertise to ensure every space honors both aesthetics and functionality.
From layout concepts and material selection to feasibility studies and permitting guidance, our team crafts a plan that aligns perfectly with your goals, style, and budget.
We anticipate challenges, streamline decisions, and prepare every detail — so your construction phase begins with total confidence and zero surprises.
Why Choose Our Remodeling Services
- Custom designs tailored to your vision
- Premium materials and modern finishes
- On-time delivery with transparent communication
- Licensed, insured, and experienced professionals
- Superior quality backed by client satisfaction







They Trusted us
why choose us
We take pride in every project we complete — and even more in the trust our clients place in us. Their satisfaction is the foundation of everything we build.
- Certified & Experienced Team
- 5.0 ⭐ Google Rating
- Free Estimates
- High-Quality, Eco-Friendly Materials
- Dependable, Honest & Efficient Service
Publicado em Google![]()
Christopher BradleyTrustindex verifica se a fonte original da avaliação é Google.
Painting job came out excellent kitchen refinished stairway came out very well. We would hire them againPublicado em Google![]()
Liang SunTrustindex verifica se a fonte original da avaliação é Google.
Doug and Boston Dream Group have done an amazing job renovating our newly purchased church building. They truly went above and beyond, especially given the difficult condition of the old structure, which had mold, asbestos, and a leaking roof. Doug and his team addressed every issue with professionalism, care, and complete transparency, ensuring all hazards were safely and thoroughly remediated. In addition to installing a new heat pump system and renovating the entire new interior, Doug guided us through the administrative challenges as well. He helped us obtain the building permit, navigated the long and tedious inspection process, and made sure everything was done properly so we could receive the occupancy permit at the end. The transformation is remarkable. What was once a problematic building is now a beautiful, functional space thanks to their vision, expertise, and dedication. We are truly grateful for all their hard work and highly recommend Doug and the Boston Dream Group to anyone seeking a trustworthy, skilled, and committed renovation partner.Publicado em Google![]()
Chien MaTrustindex verifica se a fonte original da avaliação é Google.
This whole place was renovated by BDG with their professional expertise and profound experience, and very importantly, their friendly attitude. From roof to ceiling to floor, from kitchen to hallways to bathroom, they just did excellent jobs!Publicado em Google![]()
Julie CosgroveTrustindex verifica se a fonte original da avaliação é Google.
Doug and his team at BDG are the best. This was the third and largest project we have done to our house, but our first with BDG. Our project involved a second level addition and new roof built onto our 120 year old house. The guys came every day, sometimes staying past 6, to get the project done on time. What really makes them stand out is how much they care about their work. We had an issue a few weeks after the project finished and Doug was at our house within an hour on a Saturday night and had it fixed right away. Wonderful builders - I would never work with anyone else. The results speak for themselves (see photos)Publicado em Google![]()
Carla FernandaTrustindex verifica se a fonte original da avaliação é Google.
Good team, great professioal, good company.Publicado em Google![]()
Soul sweetTrustindex verifica se a fonte original da avaliação é Google.
They have done countless jobs at my house. Including my backyard, basement, and full house renovation. Have no complaints a very good and honest companyPublicado em Google![]()
PrCostaJr USATrustindex verifica se a fonte original da avaliação é Google.
Boston dream group. Did an amazing job doing my backyard renovation. 100% recommendPublicado em Google![]()
Abraham CostaTrustindex verifica se a fonte original da avaliação é Google.
Amazing company, amazing people. They have done countless jobs at my house and i have 0 complaints. If you are looking for a construction company that gets the job done fast, and does their best work you have found it.Publicado em Google![]()
danilo martinelliTrustindex verifica se a fonte original da avaliação é Google.
Great professionals, high quality services, always finish the job on timePublicado em Google![]()
Renan DTrustindex verifica se a fonte original da avaliação é Google.
Fantastic work! Their team is incredible, professional, and a joy to work with. Highly recommend them!Certificado: TrustindexTrustindex verificou que estas avaliações foram publicadas no Perfil da Empresa no Google de Boston Dream Group. Saiba mais